Closed Tenders
Tender No | Title | Open Date | Close Date | Tender Document | Remarks | |
---|---|---|---|---|---|---|
TENDER/2024-25/309 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF WALK IN PLANT GROWTH CHAMBER | 03/12/24 | 24/12/24 03:00 pm | TENDER_DOCUMENT_2024-25_309.pdf (198.26 KB) | ||
TENDER/2024-25/349 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BIOLOGICAL REFRIGERATED INCUBATOR WITH SHAKER | 28/11/24 | 23/12/24 03:00 pm | TENDER_DOCUMENT_349.pdf (336.47 KB) | ||
17/IITPKD/EWD/ELE/2024-25/037 | Operation of Water Treatment Plant, Sewage Treatment Plant, Fire Fighting and Water Supply Pumps at Sahyadri Campus, IIT Palakkad. | 06/12/24 | 20/12/24 03:00 am | Tender Document 037.pdf (590.21 KB) | ||
IITPKD/ADMN/SHA/2024-25 | NOTICE INVITING TENDER (NIT) FOR STUDENTS’ AMENITIES CENTRE AT THE NILA CAMPUS, IIT PALAKKAD | 14/11/24 | 13/12/24 03:00 pm | Tender Document -CANTEEN.pdf (263.32 KB) CORRIGENDUM-II (127.96 KB) | ||
17/IITPKD/EWD/ELE/2024-25/035 | Operation of Water Treatment Plant, Sewage Treatment Plant, Fire Fighting and Water Supply Pumps at Sahyadri Campus, IIT Palakkad. | 14/11/24 | 04/12/24 03:00 pm | Tender Document (234.84 KB) | https://mhrd.ewizard.in/. The tender has been extended up to 04.12.2024, 1500 hrs |
|
TENDER/2024-25/297 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO PORT ARGON GLOVE BOX | 05/11/24 | 27/11/24 03:00 pm | TENDER_DOCUMENT_297 (1).pdf (750.33 KB) | ||
17/IITPKD/EWD/2024-25/034 | Construction of Permanent Campus under Phase 1 A, SW: Furnishing of Materials Lab at Ground Floor, Classroom cum Laboratory Complex (C06), Sahyadri Campus | 11/11/24 | 22/11/24 03:00 pm | Document (574.71 KB) | ||
TENDER/2024-25/PRJ_016 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF POTENTIOSTAT /GALVANOSTAT / ELECTROCHEMICAL WORKSTATION | 29/10/24 | 20/11/24 03:00 pm | TENDER_DOCUMENT_PRJ-016.pdf (379.53 KB) | ||
TENDER/2024-25/245 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ARBITRARY FUNCTION GENERATOR | 29/10/24 | 19/11/24 03:00 pm | TENDER_DOCUMENT_2024-25_245.pdf (196.79 KB) | ||
17/IITPK/EWD/ELE/2024-25/033 | SITC of 2 nos. 120kVA UPS for Data Centre in Samgatha block room 313 in Nila Campus | 30/10/24 | 13/11/24 03:00 pm | Tender Document (294.81 KB) | ||
TENDER/2024-25/253 | HIRING OF ONE AC CAMPER VEHICLE FOR OFFICIAL PURPOSES OF IIT PALAKKAD | 17/10/24 | 07/11/24 03:00 pm | Hiring of One AC Camper Vehicle (1).pdf (567.92 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/031 | Providing manpower for repair and maintenance work, water supply line, flush water and irrigation line for the year 2024-25 at Sahyadri & Nila Campus, IIT Palakkad | 18/10/24 | 07/11/24 03:00 pm | Document (559.29 KB) | https://mhrd.ewizard.in/. The tender has been extended up to 07.11.2024, 1500 hrs |
|
17/IITPKD/EWD/ELE/2024-25/032 | Providing power supply, network and earthing system for proposed charging station near local substation (A01), Saraswathi block and back side of Dr. A P J Abdul kalam building (D03) at IIT Palakkad | 18/10/24 | 07/11/24 03:00 pm | Document (760.04 KB) | https://mhrd.ewizard.in/. The tender has been extended up to 07.11.2024, 1500 hrs |
|
TENDER/2024-25/PRJ_014 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MULTICHANNEL POTENTIOSTAT GALVANOSTAT | 10/10/24 | 01/11/24 03:00 pm | TENDER_DOCUMENT_PRJ-014.pdf (341.06 KB) | ||
17/ IITPKD/EWD/CIVIL/2024-25/030 | Temporary Shed for test setup and Construction of Shed for the proposed Coffee Shop and Dining area at Dr. APJ Abdul Kalam Block, Sahyadri Campus | 17/10/24 | 30/10/24 03:00 pm | Document (907.33 KB) | ||
TENDER/2024-25/PRJ_010 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF FOURIER TRANSFORM MID INFRARED SPECTROSCOPY | 04/10/24 | 28/10/24 03:00 pm | TENDER_DOCUMENT_PRJ-010.pdf (356.87 KB) | ||
17/IITPKD/MFSDSAI/2024-25/026 | Providing Architectural and Engineering Design Consultancy for the work of Construction of MFSDSAI Building at Sahyadri Campus IIT Palakkad | 28/09/24 | 28/10/24 11:00 am | Cover 1 - Eligibility Bid (192.44 KB) Cover 2 - Technical Bid (369.67 KB) Minutes of Pre Bid Meeting (56.38 KB) Corrigendum 1 (125.62 KB) Corrigendum 2 (101.03 KB) | https://mhrd.ewizard.in/. Pre bid Meeting : 08.10.2024, 10.30 am |
|
TENDER/2024-25/229 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TRINOCULAR POLARIZING MICROSCOPE | 25/09/24 | 23/10/24 03:00 pm | TENDER_DOCUMENT_2024-25_229.pdf (211.19 KB) CORRIGENDUM-I (128.45 KB) | ||
17/ IITPKD/EWD/2024-25/024 | Operation of HVAC (3X650Tr +2X150Tr AC Plant) at Sahyadri Campus, IIT Palakkad, Kanjikode, Palakkad - 678623 | 30/09/24 | 21/10/24 03:00 pm | Tender Document (221.14 KB) | https://mhrd.ewizard.in/l. The tender has been extended up to 21.10.2024 |
|
TENDER/2024-25/185 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GEL PERMEATION CHROMATOGRAPHY (GPC) WITH REFRACTIVE INDEX DETECTOR, WITH ACCESSORIES | 26/09/24 | 18/10/24 03:00 pm | TENDER_DOCUMENT_185.pdf (339.89 KB) | ||
17/IITPKD/EWD/ELE/2024-25/029 | SITC of EV CHARGING System at Sahyadri campus | 04/10/24 | 17/10/24 03:00 pm | Tender document ev charging.pdf (358.38 KB) | ||
17/ IITPKD/EWD/CIVIL/2024-25/023 | Providing and Fixing of Name Board near to railway gate, Sahyadri Campus, IIT Palakkad | 30/09/24 | 16/10/24 02:51 pm | Tender Document (1.17 MB) | https://mhrd.ewizard.in/. The tender has been extended up to 16.10.2024 1500 hrs |
|
17/IITPKD/EWD/ELE/2024-25/028 | Providing electrical work inside the HPC room for the rack and Air conditioning system at Samgatha block, Nila campus | 07/10/24 | 14/10/24 03:00 pm | Tender Document (307.12 KB) | ||
17/ IITPKD/EWD/2024-25/025 | Operation of 11kV Substation and local substation, 11KV DG set at Sahyadri Campus, IIT Palakkad, Kanjikode | 30/09/24 | 10/10/24 03:00 pm | Tender Document (197.2 KB) | ||
17/IITPKD/EWD/2024-25/027 | Additional man power required for carrying out addition and alteration electrical works at Nila and Sahyadri campus | 30/09/24 | 10/10/24 03:00 pm | Tender Document (204.17 KB) | ||
TENDER/2024-25/136 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NANO PARTICLE AND ZETA POTENTIAL ANALYSER | 06/09/24 | 10/10/24 03:00 pm | TENDER_DOCUMENT_2024-25_136.pdf (187.87 KB) CORRIGENDUM-I (161.92 KB) CORRIGENDUM-II (128.25 KB) CORRIGENDUM-III (128.61 KB) | ||
17/IITPKD/EWD/ELE/2024-25/021 | Construction of building for EFT platform for GSCOE behind Brindavani hostel at Nila campus, IIT Palakkad SH: Internal Electrical Works including SITC of Pumps | 29/08/24 | 30/09/24 03:00 pm | Tender document (319.47 KB) | (http://mhrd.euniwizarde.in/). The tender extended up to 30.09.2024 |
|
TENDER/2024-25/148 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MULTI-CHANNEL DYNAMIC DATA LOGGING / ACQUISITION SYSTEM | 26/08/24 | 20/09/24 03:00 pm | TENDER_DOCUMENT_2024-25_148.pdf (186.69 KB) CORRIGENDUM-I (129.26 KB) | ||
17/ IITPKD/EWD/CIVIL/2024-25/022 | Providing and erecting PVC Chain Link fencing around the Basketball court at Sahyadri Campus | 30/08/24 | 19/09/24 03:00 pm | 022_PVC Chainlink.pdf (274.08 KB) | https://mhrd.ewizard.in. Tender has been extended up to 19-09-2024. |
|
TENDER/2024-25/PRJ_011 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF UV SPECTROMETER WITH PELTIER TEMPERATURE CONTROL | 20/08/24 | 19/09/24 03:00 pm | TENDER_DOCUMENT_PRJ_011.pdf (335.31 KB) Corrigendum_0.pdf (77.94 KB) TENDER_2024-25_PRJ_011 (1).pdf (101.92 KB) | ||
17/IITPKD/EWD/ELE/2024-25/019 | SITC of EV CHARGING System at Sahyadri campus | 16/08/24 | 12/09/24 03:00 pm | Tender (27).pdf (356.82 KB) Minutes of Pre bid Meeting (37.9 KB) | (http://mhrd.euniwizarde.in/). The tender extended up to 12.09.2024 |
|
GTE/2024-25/055 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NMR (NUCLEAR MAGNETIC RESONANCE) - 500 MHz | 31/07/24 | 12/09/24 03:00 pm | TENDER_DOCUMENT_055.pdf (421.34 KB) Corrigendum01 (101.26 KB) Corrigendum (83.08 KB) | ||
17/IITPKD/EWD/2024-25/020 | Providing foundation for Unitised Substation shifted from Nila campus near Sangraha football ground, Sahyadri campus and including modification for the transformer platform at Nila campus. | 29/08/24 | 11/09/24 03:00 pm | 020_Foundation for Substation (1).pdf (306.41 KB) | ||
TENDER/2024-25/094 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING WORKSTATIONS | 30/07/24 | 30/08/24 03:00 pm | TENDER_DOCUMENT_094.pdf (334.19 KB) Corrigendum (101.64 KB) | ||
TENDER/2024-25/PRJ_009 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SHAKER HYDROGENATION REACTOR | 25/07/24 | 27/08/24 03:00 pm | TENDER_DOCUMENT_PRJ-009.pdf (334.47 KB) Corrigendum01 (101.35 KB) | ||
17/IITPKD/EWD/ELE/2024-25/018 | DIVERTING ELECTRICAL LOADS OF MAIN CAMPUS FROM NILA CAMPUS, PROVIDING ELECTRICAL SUPPLY TO NEWLY PROPOSED DATA CENTRE OF SAMGATHA BLOCK AND PROVIDING ADDITIONAL STANDBY FACILITY FOR ELECTRICAL LOADS OF AGORA, SAMGATHA AND NEW DATA CENTRE TO SYNCHRONISING | 14/08/24 | 27/08/24 03:00 pm | Corrigendum (433.11 KB) Corrigendum (161.57 KB) Revised Drawing (213.1 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/017 | Additional Work bench for Electronics lab at C06 - Sahyadri Campus | 08/08/24 | 22/08/24 03:00 pm | Tender Document (269.7 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/016 | Construction of Permanent Campus under Phase 1 A, SH: Furniture & Fittings SW: Providing additional work bench and overhead cabinet for the Chemistry Lab at Saraswati Block, Sahyadri Campus | 08/08/24 | 22/08/24 03:00 pm | Tender Document (270.53 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/015 | Providing and Fixing Partition, False Ceiling and False Flooring for HPC Room (Room No:313) at Samgatha, Nila campus | 31/07/24 | 20/08/24 03:00 pm | Tender Document (292.48 KB) | The tender has been extended up to 20.08.2024 |
|
17/IITPKD/EWD/CIVIL/2024-25/014 | Construction of Permanent Campus under Phase 1 A, SH: Furniture & Fittings SW: Providing work benches in Essence Lab at C06 - Sahyadri Campus | 19/07/24 | 01/08/24 03:00 pm | Document (318.45 KB) | ||
TENDER/2024-25/068 | NOTICE INVITING TENDER (NIT) FOR CUSTOM MADE MEDICAL INSURANCE AND PERSONAL ACCIDENT INSURANCE FOR THE EMPLOYEES AND CUSTOM MADE MEDICAL INSURANCE AND PERSONAL ACCIDENT INSURANCE FOR THE STUDENTS OF IIT PALAKKAD | 05/07/24 | 26/07/24 03:00 pm | TENDER_DOCUMENT_MEDICAL_INSURANCE - 2024-25_068 (1).pdf (245.18 KB) Minutes of the Prebid Meeting (185.48 KB) | The bids should be submitted offline; dropped in the tender box or may be sent to IIT Palakkad (Address: The Registrar, Kind attention “Assistant Registrar (SS), Purchase Section”, Dr. A. P. J. Abdul Kalam Block, Sahyadri Campus, Kanjikode, Palakkad 678623, Kerala) latest by 26-07-2024, 1500 hours. Bids received after the above mentioned date and time shall not be considered. Date of Pre Bid Meeting and Time (ONLINE) : 15-07-2024, 14:30 HRS
|
|
TENDER/2024-25/PRJ_008 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING GPU WORKSTATIONS | 27/06/24 | 23/07/24 03:00 pm | TENDER_DOCUMENT_PRJ_008.pdf (329.13 KB) Corrigendum (102.1 KB) | ||
17/ IITPKD/EWD/HORT/2024-25/013 | Construction of Permanent campus for IIT Palakkad under Phase 1A SH : Development Work Horticulture Work around A1, K1, K2 & L1 buildings at Sahyadri Campus | 02/07/24 | 22/07/24 03:00 pm | Tender Document (321.09 KB) | ||
17/ IITPKD/EWD/2024-25/012 | Construction of building for EFT platform for GSCOE behind Brindavani hostel at Nila campus, IIT Palakkad | 25/06/24 | 16/07/24 03:00 pm | Tender Document (651.08 KB) | ||
17/IITPKD/EWD/HORT/2024-25/011 | ANNUAL MAINTENANCE OF HORTICULTURE AND LANDSCAPE AREAS AT IIT PALAKKAD DURING THE YEAR 2024-25. | 21/06/24 | 11/07/24 03:00 pm | Tender Document (863.88 KB) | ||
TENDER/2024-25/PRJ_006 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE WATER QUALITY MULTIMETER WITH PROBES | 10/06/24 | 01/07/24 03:00 pm | TENDER_DOCUMENT_2024-25_PRJ_006.pdf (490.96 KB) | ||
TENDER/2023-24/PRJ_105 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ROTARY FRICTION WELDING MACHINE | 07/06/24 | 01/07/24 03:00 pm | TENDER_DOCUMENT_PRJ_105.pdf (358.25 KB) | ||
TENDER/2024-25/PRJ_005 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ULTRA PURE WATER PURIFICATION SYSTEM | 07/06/24 | 01/07/24 03:00 pm | TENDER_DOCUMENT_PRJ-005.pdf (348.76 KB) | ||
TENDER/2024-25/037 | NOTICE INVITING TENDER (NIT) FOR STUDENTS CANTEEN AT THE SAHYADRI CAMPUS, IIT PALAKKAD | 07/06/24 | 28/06/24 03:00 pm | Students canteen -2024-2025_037.pdf (366.9 KB) | ||
17/IITPKD/EWD/ELE/2024-25/009 | SITC OF 1 NO. 1000KVA OUTDOOR TYPE TRANSFORMER WITH OLTC IN PLACE OF 1000KVA USS AT NILA CAMPUS, SHIFTING OF USS TO MAIN CAMPUS AND CONNECTED WORKS AT IIT PALAKKAD | 14/06/24 | 27/06/24 03:00 pm | Tender document (462.85 KB) | ||
17/IITPKD/EWD/ELE/2024-25/008 | PROVIDING POWER AND NETWORK POINTS TO PERIYAR RIVER PROJECT AND POSTDOC SITTING SPACE IN D03 2ND FLOOR IN SAHYADRI CAMPUS. | 13/06/24 | 26/06/24 03:00 pm | Tender document (395.21 KB) | ||
17/ IITPKD/EWD/2024-25/010 | CONSTRUCTION OF PERMANENT CAMPUS FOR IIT PALAKKAD UNDER PHASE 1A SH: CIVIL WORK, SW: CASTING STREET LIGHT FOUNDATION FOR ATHLETIC CUM CRICKET GROUND, BASKETBALL COURT AND C-01 LCSS TO D-03 ROAD SIDE AT SAHYADRI CAMPUS | 13/06/24 | 26/06/24 03:00 pm | Tender document (825.84 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/006 | Partition for Second Floor- IPTIF CEO office space and Workshop shed for IPTIF at Dr. APJ Abdul Kalam block - Sahyadri Campus, IIT Palakkad | 20/05/24 | 10/06/24 03:00 pm | Tender Document (587.55 KB) | https://mhrd.ewizard.in/. The tender has been extended up to 10.06.2024, 1500 hrs |
|
17/IITPKD/EWD/CIVIL/2024-25/007 | Light weight partition for Second Floor Periyar research and Postdoc space at Dr. APJ Abdul Kalam block, Sahyadri campus, IIT Palakkad | 24/05/24 | 07/06/24 03:00 pm | Tender Document (489.79 KB) | ||
17/ IITPKD/EWD/2024-25/005 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SH: Civil Work, SW: Earth work in D1 & D2 area, raising manholes and providing a toe wall around LCSS 2 near D1 at Sahyadri Campus | 10/05/24 | 07/06/24 03:00 pm | Tender Document (628.5 KB) | https://mhrd.euniwizarde.com/. The tender has been extended up to 07.06.2024 |
|
TENDER/2024-25/PRJ_003 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING COMPUTER | 03/05/24 | 04/06/24 10:00 am | TENDER_DOCUMENT.pdf (308.63 KB) Corrigendum -01 (100.23 KB) | ||
17/ IITPKD/EWD/2024-25/004 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SH: Civil works SW : Providing & fixing concertina coil on the Nila campus compound wall and fixing MS gate for the service road near the football ground in Sahyadri Campus, I | 10/05/24 | 24/05/24 03:00 pm | Tender Document (769.81 KB) | ||
17/IITPKD/EWD/CIVIL/2024-25/003 | Name of work: Construction of Permanent Campus under Phase 1 A, SH: Furniture & Fittings SW: Providing & Fixing Furniture for Control and Motion capture Lab at Dr. APJ Abdul Kalam Block – Sahyadri Campus | 06/05/24 | 20/05/24 03:00 pm | Tender Document (2.29 MB) | ||
TENDER/2024-25/001-A | EMPANELMENT OF INTELLECTUAL PROPERTY (IP) FIRMS | 18/04/24 | 15/05/24 03:00 pm | TENDER_DOCUMENT_IPR_0.pdf (412.28 KB) Corrigendum (82.23 KB) | ||
TENDER/2024-25/PRJ_002 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE SOIL MOISTURE PROFILE PROBE | 18/04/24 | 09/05/24 03:00 pm | TENDER_DOCUMENT_2024-25_PRJ_002.pdf (186.95 KB) | ||
17/ IITPKD/EWD/2024-25/002 | Providing and Laying Cement concrete interlocking paver blocks around Water Treatment Plant, rear side of Kedaram and Parking at Classroom Cum Laboratory complex (C06) at Sahyadri campus | 23/04/24 | 06/05/24 05:04 pm | Tender Document (467.63 KB) | ||
17/IITPKD/EWD/ELE/2024-25/001 | Name of Work : Operation and Maintenance of 40kLD STP in Nila Campus and 10kLD STP at C06 building in Sahyadri Campus at IIT Palakkad | 05/04/24 | 18/04/24 05:02 pm | Tender Document (240.29 KB) | ||
TENDER/2023-24/607 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HEATING FILAMENT | 01/03/24 | 15/04/24 03:00 pm | TENDER_DOCUMENT_2023-24_607.pdf (210.65 KB) Corrigendum-I (99.97 KB) Corrigendum-II (100.37 KB) | ||
TENDER/2023-24/524 | SUPPLY OF Ti6Al4V METAL POWDER | 01/03/24 | 10/04/24 03:00 pm | TENDER_DOCUMENT_2023-24_524.pdf (185.69 KB) CORRIGENDUM-I (100.86 KB) CORRIGENDUM-II (172.32 KB) | ||
TENDER/2023-24/589 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF FRICTION STIR WELDING AND PROCESSING MACHINE | 06/03/24 | 05/04/24 03:00 pm | TENDER_DOCUMENT_589.pdf (365.56 KB) PREBID MINUTES (190.28 KB) Corrigendum-I (101.15 KB) Corrigendum-II (101.17 KB) | ||
TENDER/2023-24/598 | SUPPLY OF METAL POWDERS CM247LC AND NICKEL ALLOY HX | 01/03/24 | 05/04/24 03:00 pm | TENDER_DOCUMENT_2023-24_598_.pdf (187.09 KB) Corrigendum-I (101.28 KB) | ||
TENDER/2023-24/692 | SUPPLY OF MICROSOFT WINDOWS OPERATING SYSTEM FOR THE DESKTOP/LAPTOP OF RESEARCH SCHOLARS | 14/03/24 | 05/04/24 03:00 pm | TENDER_DOCUMENT_692.pdf (314.42 KB) | ||
TENDER/2023-24/606 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BATTERY CYCLER | 12/03/24 | 03/04/24 08:01 pm | TENDER_DOCUMENT- 606.pdf (496.07 KB) | ||
TENDER/2023-24/PRJ_107 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BIO SAFETY CABINET | 11/03/24 | 01/04/24 03:00 pm | TENDER_DOCUMENT_2023-24_PRJ_107.pdf (189.9 KB) | ||
TENDER/2023-24/PRJ_106 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SERVER | 06/03/24 | 28/03/24 03:00 pm | TENDER_DOCUMENT_PRJ_016.pdf (354.28 KB) | ||
TENDER/2023-24/591 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOP | 01/03/24 | 22/03/24 03:00 pm | TENDER_DOCUMENT_2023-24_591.pdf (167.52 KB) | ||
TENDER/2023-24/584 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MOTORIZED 3- AXIS LINEAR POSITIONING SYSTEM | 28/02/24 | 21/03/24 03:00 pm | TENDER_DOCUMENT_584.pdf (320.07 KB) | ||
TENDER/2023-24/575 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PIN-ON-DISC TRIBOMETER | 19/02/24 | 21/03/24 03:00 pm | TENDER_DOCUMENT_2023-24_575.pdf (187.58 KB) Corrigendum-I (100.32 KB) Corrigendum-II (100.31 KB) | ||
TENDER/2023-24/581 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PARABOLIC MIRRORS FOR SCHLIEREN IMAGING | 27/02/24 | 20/03/24 03:00 pm | TENDER_DOCUMENT_581.pdf (315.56 KB) | ||
TENDER/2023-24/582 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HONEYCOMB TABLE TOP WITH STAND | 27/02/24 | 20/03/24 03:00 pm | TENDER_DOCUMENT_582.pdf (323.88 KB) | ||
TENDER/2023-24/399 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AMBULANCE | 26/02/24 | 14/03/24 03:00 pm | TENDER_DOCUMENT_399.pdf (369.01 KB) | ||
TENDER/2023-24/PRJ_099 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PLASMA POLISHING MACHINE | 30/01/24 | 11/03/24 03:00 pm | CORRIGENDUM-I (348.58 KB) TENDER_2023-24_PRJ_099 (1).pdf (100.35 KB) CORRIGENDUM-II (82.22 KB) | ||
TENDER/2023-24/523 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF REFRIGERATED CENTRIFUGE | 06/02/24 | 11/03/24 03:00 pm | TENDER_DOCUMENT_2023-24_523.pdf (187.64 KB) Corrigendum-I (100.22 KB) | ||
TENDER/2023-24/522 | SUPPLY OF INCONEL 718 AND INCONEL 939 METAL POWDER | 06/02/24 | 07/03/24 03:00 pm | TENDER_DOCUMENT_522.pdf (355.3 KB) CORRIGENDUM-I (101.06 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/068 | Providing Manpower for Maintenance Services or the year 2024-25 at Sahyadri & Nila Campus, IIT Palakkad | 21/02/24 | 05/03/24 04:59 pm | Document (247.83 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/062 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A, SH: Supply and erection of One number of Precast RCC Cabins at Mechanical Lab, Dr. APJ Abdul Kalam Block (D03) in Sahyadri Campus, IIT Palakkad | 21/02/24 | 05/03/24 04:59 pm | Document (360.81 KB) | ||
17/ IITPKD/EWD/2023-24/060 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SW : Reconstruction of damaged compound wall on southern boundary near BC5 and BC4 in Sahyadri Campus, IIT Palakkad | 09/02/24 | 29/02/24 04:51 pm | Document (753.76 KB) | ||
TENDER/2023-24/526 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LIQUID NITROGEN TRANSFER VESSELS WITH ACCESSORIES (CART) | 07/02/24 | 29/02/24 03:00 pm | TENDER_DOCUMENT_526.pdf (315.22 KB) | ||
17/ IITPKD/EWD/2023-24/061 | Providing and fixing light weight partition in GSCOE Lab, Classroom cum Laboratory Complex (C06), Sahyadri campus | 27/02/24 | 27/02/24 04:58 pm | Document (448.87 KB) | ||
TENDER/2023-24/463 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TUBE FURNACE | 31/01/24 | 23/02/24 03:00 pm | TENDER_DOCUMENT_463.pdf (549.84 KB) | ||
TENDER/2023-24/441 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MAGNETIC FLUX DENSITY METER (INCLUDING SENSOR BUNDLE) | 08/02/24 | 23/02/24 03:00 pm | TENDER_DOCUMENT_441.pdf (350.38 KB) | ||
17/ IITPKD/EWD/2023-24/059 | Conversion of Hostel to Guest House Room in Nila Campus SH : Internal Painting work at Bageshri Guest Rooms, Nila Campus, IIT Palakkad | 09/02/24 | 21/02/24 04:51 pm | Document (302.53 KB) | ||
17/ IITPKD/EWD/2023-24/060 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SW : Reconstruction of damaged compound wall on southern boundary near BC5 and BC4 in Sahyadri Campus, IIT Palakkad | 09/02/24 | 21/02/24 04:51 pm | Document (513.38 KB) | ||
TENDER/2023-462 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ISOTHERMAL CALORIMETER | 31/01/24 | 21/02/24 03:00 pm | TENDER_DOCUMENT_2023-24_462.pdf (185.75 KB) | ||
TENDER/2023-24/495 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NETWORK ATTACHED STORAGE DEVICE WITH HARD DISK | 30/01/24 | 20/02/24 03:00 pm | TENDER_DOCUMENT_2023-24_495.pdf (185.1 KB) | ||
17/ IITPKD/EWD/2023-24/058 | Construction of two number bus waiting shed at Opposite to Kedaram Block and Opposite to Nila Campus Inside Sahyadri Campus | 02/02/24 | 15/02/24 04:43 pm | BUSSHEDTENDER (3).pdf (625.43 KB) | ||
TENDER/2023-24/493 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DIELECTRIC CONSTANT SET-UP | 24/01/24 | 15/02/24 03:00 pm | TENDER_DOCUMENT_493 (1).pdf (361.86 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/056 | Supply and Installation of Furniture for Dr. APJ Abdul Kalam Block (D03) and Classroom Building (C06) at Sahyadri Campus | 25/01/24 | 07/02/24 04:06 pm | Tender (14).pdf (1019.09 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/056 | Supply and Installation of Furniture for Dr. APJ Abdul Kalam Block (D03) and Classroom Building (C06) at Sahyadri Campus | 25/01/24 | 07/02/24 04:06 pm | Document (1019.09 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/055 | Construction of Gas Bank for CIF and Mechanical lab at Dr.APJ Abdul Kalam block (D03), Sahyadri Campus | 22/01/24 | 05/02/24 04:04 pm | Tender document (33).pdf (632.13 KB) CIF LAB.pdf (407.41 KB) Mechanical labs.pdf (185.82 KB) | ||
TENDER/2023-24/PRJ_072 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GAS CHROMATOGRAPHY (GC) - FID, TCD AND HEADSPACE SAMPLER | 05/01/24 | 05/02/24 03:00 pm | TENDER_DOCUMENT_2023-24_PRJ_072.pdf (193.63 KB) | ||
TENDER/2023-24/PRJ_087 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF COMPUTER | 11/01/24 | 02/02/24 03:00 pm | TENDER_DOCUMENT_PRJ-087.pdf (316.85 KB) Corrigendum-I (74.3 KB) | ||
TENDER/2023-24/PRJ_063 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CHNS-O ELEMENTAL ANALYZER | 11/01/24 | 02/02/24 03:00 pm | TENDER_DOCUMENT_PRJ-063.pdf (367.47 KB) | ||
GTE/2023-24/440 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE SPEECH RESEARCH ULTRASOUND SYSTEM | 10/01/24 | 01/02/24 03:00 pm | TENDER_DOCUMENT_440.pdf (325.19 KB) | ||
TENDER/2023-24/PRJ_074 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BOMB CALORIMETER | 10/01/24 | 01/02/24 03:00 pm | TENDER_DOCUMENT_PRJ074.pdf (341.12 KB) |